Project brief

Warehouse fit-out for Bishopsgate

Bishopsgate Specialist Logistics and Installations, a prominent provider of delivery and logistics services, has a history of partnering with Stamina Storage Systems for their warehouse solutions. Following their successful collaboration in Warrington, where Stamina supplied pallet racking for their facility, Bishopsgate turned to them once again. This time, they sought a tailored storage solution for their newly acquired warehouse in Lanarkshire, Glasgow.

The challenge

The project presented several challenges, including the need to complete the installation seamlessly in two phases while adhering to the contractor's schedule. Additionally, ensuring that the storage requirements for our loyal customer were met promptly was a top priority, this included involved configuring and the designing the racking to store 4707 Euro pallets and 3138 Chep Pallets.

The solution

Stamina Storage Systems designed and supplied their own high quality Stamina Rack system. Designed with a wide aisle configuration, comprising 6 double-sided runs of 20 bays, along with a single run of 28 bays. This design maximised storage capacity, offering enhanced efficiency for Bishopsgate’s operations.  Additionally, rack end barrier protection and individual Protect-It Stackable column protectors were installed to safeguard the racking system and ensure workplace safety. With meticulous planning and execution, the team successfully completed the project within the specified timeline. By dividing the installation into two phases,  minimised disruption to the client's operations and ensured that their storage solutions were ready and waiting for them on move day.

The results

The successful completion of the pallet racking installation has provided Bishopsgate Specialist Logistics and Installations with the necessary storage capacity to meet their operational needs efficiently. Their commitment to delivering quality and tailored warehouse solutions has strengthened the partnership with the client and positioned us as a trusted partner for future projects.

"Our new warehousing space creates opportunities for significant further growth by enabling us to develop our services to customers, and the team at Stamina Storage Systems were able to fully maximise the space with their pallet racking system. They worked closely with our team to ensure the installation was seamless and ready on time for out move in date – we are very pleased with the result."

They worked closely with our team to ensure the installation was seamless and ready on time for out move in date – we are very pleased with the result."
Jake Bloch , Operations Director, Bishopsgate